BUILDING 318 SOUTH COAST RD PEACEHAVEN
SOUTH FACING FRONT OF BUILDING CRACKING AND GAPS CAN BE CLEARLY SEEN ON LEFT SIDE AS CAN ROTTING FASCIA BOARDS
THE FRONT EXTENSION WAS TOTALLY RE-BUILT CAVITY TRAY FITTED NEW ROOF & FLASHING ALL TIMBER WORK AND WINDOW FRAMES IN THE 90s
TRAY HAD TO BE FITTED BECAUSE OF WATER COMING DOWN INSIDE THE WALLS FROM TOP FLAT AREA